Wednesday, November 12, 2008

@ -T.: Before

Heh.


The bright white on the left is a built in cabinet.

3 comments:

-T. said...

Heh! Shockingly similar!

Well, I stopped by the house at lunch time and all the news was good. The cast vent pipe that goes through the first floor is in very good shape. They should have the rotten stuff replaced today. They think they have figured out a way to get new copper waterlines all the way to the basement, so everything in the bathroom will get cut out completely. This will allow us to push the west wall out about 4" We also decided to put a "plant shelf" on the east wall (across from the sink/toilet), so that should open the room up a bit more still. Pics when I get home. If I get out of work before midnight...

Paul said...

Tell 'em to run 3/4" to the bathroom if they can. Even if it just feeds the tub it's worth it. We did, and then ran 1/2" to the sink from the main feed.

Good news on the vent pipe.

Are they replacing the subfloor? I ripped up the old fir planks and put in 1.25" plywood. Super stiff, no tile cracks. Insulated under the floor, too, for noise reduction.

-T. said...

Yep. Floor is probably coming up today. I'll look into the 3/4.