Monday, August 22, 2011

Friday, August 5, 2011

Deck Railings



We had the steel fabricated, powder coated and installed. I crafted the IpĂȘ cap.

Friday, April 15, 2011

Master Suite




We've been busy...

Remaining items include lights over the mirror in the bathroom, paint the doors, order/install the large barn style door to the bathroom and hang some art. The Cal King mattress will be delivered on Monday (as will the linens). Still have to build out the master closet.

For fun, you can check out some progress pics of our former kitchen here, here and here.

Tuesday, January 11, 2011

Railing!





Ordered in September... Worth the wait we think. Hot-rolled steel frame, stainless steel infill and a cherry top. The modern design works for the downstairs, and doesn't 'offend' the Victorian finishes upstairs. But the open air the railing fills has been empty for a year - this is taking some getting used to.

Monday, November 29, 2010

Friday, November 12, 2010

Thursday, October 28, 2010

Wednesday, September 22, 2010

Kick Start: The Final Push



It's been a while since posting about the house, but work has continued. I've patched most of the exterior holes and painted outside (removed an asbestos flue and unnecessary pipes/conduit). Also painted the 'wings' out back next to the deck (firewalls with actual siding).

I took this week off from work, and so far I've installed new doors in the master suite. The first photo shows the entry door we had made to match the existing doors in the hall. The second shows the three doors from inside the master. From the left: the entry, closet pocket door, and the water closet inside the bathroom. The large opening to the bathroom will have a barndoor that slides along the wall next to the closet and will likely match the style of the master entry door. TBD. (We'll likely use the hardware shown here.)

The goal for this week is to get closer to paint. Sometime in the next few weeks the railings will be installed, as will the vanity in the master bath. Then tile, glass and countertops. Then...we should be about ready for final inspection by the end of the year.

Monday, June 7, 2010

Moving Back: Familiar Rooms Reconstructed






It's been a busy few days - lots of paint and other finish work to move upstairs into our "old" digs. Tonight we'll sleep in our old bedroom again, and the upstairs living room and office are back together.

Monday, May 31, 2010

Nurse Becomes Patient


Stepped down off the ladder and caught the small toe on my right foot in a cross brace. Large laceration, and complete avulsion fracture at the second joint - basically a dislocation and lucky I didn't take off the whole toe. Went to the ER here in The City for X-Rays and stitches. Tomorrow I report for surgery.

Pain is minimal so far and bleeding is finally controlled. The only limp I have right now is from the funky shoe I'm wearing. More annoyed about the inconvenience than anything... Started taking antibiotics tonight(Keflex) - let's see if I've got C Diff!!

Brendan - MD Wagner took care of me--got VIP treatment once I showed my badge. But what a slow ED!! :)

Thursday, May 27, 2010

Milestones


297 days later, the Port-a-Potty is gone from our curb. Can you spot the other big change?

Friday, April 30, 2010

Tuesday, April 20, 2010

Unfinished Business: Warming Up The Office



Today I tore out the (soon-to-be sub)floor in the office over the front entryway. This room is where Wendy spends most of her days, and is always cold in the winter. It's also where we watch movies on the 'big' screen (can't beat a 27" Dell monitor with surround sound, right?).

By sometime next week this will be covered in Brazilian Cherry to match the downstairs. Have to remove all the base boards first...

Tuesday, April 6, 2010

The Dream Is Alive

Master Bedroom

Master Bedroom & Bath

Master Bath

Master Bath and Closet

Master Closet

Above is a panoramic tour of the master suite after the drywall was installed today. Another week and a half and they'll be done. Then we'll have the upstairs floor installed (to match downstairs). Then we'll kick the contractors out for a while while we recoup. We'll work on getting that master bath functional over the next year.

All of this is good news for the cats -- they're tired of managing this process.


Wednesday, March 17, 2010

Wednesday, March 3, 2010

Demo, Round II


We moved downstairs into our new kitchen/bathroom/bedroom over the weekend and today they tore out the old upstairs kitchen, dining room and master closet. All of which will become our new master suite. More dust, more noise.

Monday, February 22, 2010

Thursday, February 18, 2010

Did I Mention The Floors Are Done?

Brazilian Cherry

Lots happening. Kitchen is nearly ready for us and we'll move downstairs in the next few days. Deck is almost done. Front entryway is done but needs paint. Nearly done painting the downstairs bathroom.

I'll post more photos soon.

Thursday, January 21, 2010