At 19x23', we're pretty sure this room is bigger than the studio we lived in for 7 years. Kitchen to the left, island right about where the plywood is, huge expanse to the right. Two big french doors to the deck.
I'm a 42 y.o. undergrad student. I start at NLU the 2nd week of Sept and, with a pretty intense schedule, should finish up 10/10. Now all I have to do is figure out how to pay for it, Tayler's school and the house...
The latest drama includes a two hour trip to the planning department on Friday to re-issue our expired permit (cha-ching) and the fun shown in pictures below. There's something beautiful about rebar (to be covered) and forms (to be dismantled).
Rear Foundation Wall
Grade Beams
Inspector comes by tomorrow, concrete pour on Tuesday. Framing crew shows up on Wednesday. Plumbers next week to lay new sewer line. Slab sometime in the next few weeks.
All the non-exterior foundation supports are gone and trenches are below. There will be two 18" grade beams poured under the main supports of the house, and a new foundation wall at the back of the house. After that, plumbing and framing. Then a new slab for the garage. In the meantime, the house is propped up.
Today they started digging the trenches for structural concrete: foundation at back of house, grade beams, post supports. I think they'll pour them by W/Th. Then they'll frame above and add the new plumbing/electrical at grade. Very fun. And noisy. W's going to CO to escape.