It's been a while since posting about the house, but work has continued. I've patched most of the exterior holes and painted outside (removed an asbestos flue and unnecessary pipes/conduit). Also painted the 'wings' out back next to the deck (firewalls with actual siding).
I took this week off from work, and so far I've installed new doors in the master suite. The first photo shows the entry door we had made to match the existing doors in the hall. The second shows the three doors from inside the master. From the left: the entry, closet pocket door, and the water closet inside the bathroom. The large opening to the bathroom will have a barndoor that slides along the wall next to the closet and will likely match the style of the master entry door. TBD. (We'll likely use the hardware shown
here.)
The goal for this week is to get closer to paint. Sometime in the next few weeks the railings will be installed, as will the vanity in the master bath. Then tile, glass and countertops. Then...we should be about ready for final inspection by the end of the year.